Skip to main content

SSS Reporting in Practice

See how SSS methodology applies to real utilities—from vertically integrated IOUs with embedded nuclear to competitive markets with complex REC flows.

Utility Case Studies

Each case study walks through the full SSS workflow: market boundary definition, data sourcing, qualification rules, pro-rata allocation, and SSEF construction.

Florida Power & Light

Featured

FPL (NextEra Energy)Florida2023

~23% SSS zero-carbon share from embedded nuclear generation

SSS Share: ~23%Nuclear (Turkey Point, St. Lucie)
View Full Case Study →

Meta Constellation Nuclear PPA

Constellation Energy (Illinois)Illinois / PJM2023-2024

Impact analysis of large nuclear PPAs on regional SSS availability

SSS Share: VariableNuclear fleet
View Full Case Study →

Entergy Arkansas Go Zero Tariff

Entergy ArkansasArkansas / SPP2023

Green tariff interaction with SSS—how voluntary programs affect baseline claims

SSS Share: ~35%+Nuclear + Hydro
View Full Case Study →

TechFab + River Valley Power

A composite engagement illustrating typical SSS outcomes: ~50% Scope 2 reduction potentialfrom embedded carbon-free energy, 10-20x ROI on platform costs (driven by avoided replacement procurement), and 1-2 month delivery vs. 6+ months for manual research.

~50%
Scope 2 Reduction
10-20x
ROI Range
1-2 mo
Delivery Time

Each Case Study Includes

At-a-Glance Metrics

SSS share, SSEF, data confidence, coverage scope

Market Boundary

Service territory, ISO/RTO status, retail structure

Data Sourcing

EIA filings, compliance records, certificate registries

Qualification Rules

What counts as SSS-eligible carbon-free energy

Pro-Rata Calculation

Step-by-step allocation with worked examples

SSEF Construction

Bottom-up emission factor for residual load

Limitations

Data gaps, assumptions, and update cadence

Full Citations

Every data source linked for audit traceability

Want a Case Study for Your Utility?

We're expanding coverage continuously. If your utility isn't listed yet, contact us to discuss preliminary estimates or prioritized onboarding.