Argentina

Overview

AttributeValue
SSS Relevance⭐⭐⭐ High
Market TypeMixed (CAMMESA coordination)
Key Clean ResourcesNuclear (7%), Hydro (25%), Wind/Solar (growing)
EAC SystemI-REC
Grid Carbon Intensity~300-350 gCO2/kWh

Argentina has South America's largest nuclear program with three operating reactors, plus significant hydro. Nuclear provides ~7% of generation.

SSS Relevance

⭐⭐⭐ High — Argentina offers good SSS potential:

  • Operating nuclear fleet (3 reactors, ~5 GW planned capacity)
  • Significant hydro (~25% of generation)
  • Growing renewables under RenovAr program

SSS-Eligible Resources

Resource TypeCapacity/OutputSSS Classification
Nuclear~1.8 GW, ~7% of generation✅ Clearly SSS — default delivered baseload
Hydro~11 GW, ~25%⚠️ Depends on I-REC status

Operating Nuclear Plants:

  • Atucha I (357 MW, PHWR)
  • Atucha II (745 MW, PHWR)
  • Embalse (648 MW, CANDU)

Pipeline: CAREM-25 SMR under construction; additional units planned.

Market Structure

Regulator: ENRE (Ente Nacional Regulador de la Electricidad)

Market Coordinator: CAMMESA (Compañía Administradora del Mercado Mayorista Eléctrico)

Model: Wholesale market with dispatch coordination; regulated retail.

Major Generators:

  • Nucleoeléctrica Argentina (nuclear), YPF Luz, Pampa Energía, Central Puerto

Clean Energy Policy

PolicyStatus
Renewables Target20% by 2025
Nuclear PolicyStrongly supportive — SMR development, fleet expansion
RenovAr ProgramAuction program for renewable PPAs

EAC Infrastructure

Primary System: I-REC

AttributeDetails
I-REC IssuerVarious
ScopeRenewables

Important for SSS: Argentine nuclear is state-operated (NASA) and does not participate in I-REC. Nuclear flows to grid as default supply.

Emissions Factors

SourceValueUse Case
Argentine Grid Average~300-350 gCO2/kWhLocation-based Scope 2

Data Sources